Payment Terms︰ | By T/T, 30% deposit in advance, 70% balance payable before loading. |
Packing︰ | Each product would be packed with thick foam and EPE roll and EPE protect coner inside, 5 layers carton outside, sometimes use wood slats to strengthen it. |
|
|
Product Image
|